Photos Coming Soon
Bathroom Remodel : Spa-like Experience
A warm, multi-purpose lower level designed for entertaining, relaxation, and long-term value.
Project Summary
Date: 2019
Style: Contemporary
Project Type: Bathroom Remodel
Location: Lakeville, MN
Materials For Bathroom Remodel
Materials For Bathroom Remodel
Tile
Vanity
Shower Surround
Shower Glass
Countertop
Remodel
Approach
Custom Layout & Framing
Framed an open living zone with distinct TV lounge and gaming space
Created a half bathroom with privacy and future shower rough-in
Added recessed alcoves for shelving and storage to reduce furniture needs
Durable, Stylish Materials
Installed water-resistant luxury vinyl plank flooring throughout
Used neutral color palette with warm wood accents for long-term appeal
Installed sound-insulated ceilings and walls between floors
Built-Ins & Finishing Touches
Designed and built a media wall with integrated cable/electrical routing
Added dimmable lighting zones to support different room uses
Painted and trimmed with premium materials for longevity
We updated with new products and materials, and we repaired the rooms as needed.
Bathroom Renovation
The bathroom was updated with Schluter in-floor heat and rectangular tiles (Firenze Carrara Tile) installed along the floor and walls. The tiling had a marble gray finish, matching the tone of the countertops and contrasting the clean, custom cabinets surrounding the new Caldonia vanity.
Office Renovation
The office renovation required all new flooring, custom cabinets, and new countertops. The cabinets were Black Walnut. And the countertops were Tier 5, Rolling Jasmine Quartz which matched well with the hexagonal Carlos Silver tiles. Underneath the tiles, we installed Schluter Ditra-Heat flooring.
Office Challenges
Removal of the original floor revealed asbestos underneath. Remediation and contamination were required.
Bathroom Challenges
The challenge for the bathroom involved a rework of the ventilation system. There were issues with the exhaust fan’s ducts. We installed new venting on the roof and out of the side of the home.
Project Timeline
| Phase | Duration | Highlights |
|---|---|---|
| Consultation & Estimate | 3 days | On-site walkthrough and itemized quote delivered within 72 hours |
| Design & Planning | 1 week | Layout options reviewed; fixtures and finishes selected |
| Permits & Materials | 1.5 weeks | Permit approved and materials ordered to match timeline |
| Construction | 4 weeks | On-time execution with weekly check-ins and walkthroughs |
| Final Walkthrough | 2 days | Minor paint touch-ups and final client approval |
- Project completed on schedule and within 2% of original estimate.
Inspired by this project?
Let's talk about what's possible in your home.
More Like This
Related Bathroom Projects
Let's Bring Your Vision to Life.
Our team is ready to transform your home. Let's start with a free consultation — no pressure, no obligation.
Reviews: 135