Burnsville Basement Remodel – Bar & Entertainment
A warm, multi-purpose lower level designed for entertaining, relaxation, and long-term value.
Project Summary
Our client in Burnsville wanted their basement remodeled for optimal guest experiences. That included a new bar area as well as a built-in sound system throughout the space. Additionally, we replaced the flooring and added wall accents made of unique materials.
Date: 2022
Project Type: Basement Remodel
Location: Burnsville, MN
Home Remodeler Analysis
This was a great space for entertaining guests, and it provided us with the room necessary to deliver a full basement remodel. We also noted that the ceiling texture would present a challenge with the sound system.
The Client’s Goals
To remodel the space for an enhanced entertainment experience. They wanted a “throwback” look for the bar along with a new sound system.
Add livable square footage for growing kids and overnight guests
Create a media area with built-in storage and surround sound
Include a half bath for convenience
Maintain open sightlines while still offering room definition
Project Photos
Remodeler
Approach
Custom Layout & Framing
Framed an open living zone with distinct TV lounge and gaming space
Created a half bathroom with privacy and future shower rough-in
Added recessed alcoves for shelving and storage to reduce furniture needs
Durable, Stylish Materials
Installed water-resistant luxury vinyl plank flooring throughout
Used neutral color palette with warm wood accents for long-term appeal
Installed sound-insulated ceilings and walls between floors
Built-Ins & Finishing Touches
Designed and built a media wall with integrated cable/electrical routing
Added dimmable lighting zones to support different room uses
Painted and trimmed with premium materials for longevity
We used barn materials for much of this build, including barn wood (from a barn in Faribault, MN) and galvanized steel panels (from a barn in St. Cloud, MN). We also installed an artisan 3D multi-color barn wood accent wall. Other installations included NST Porcelain Plank Tile Flooring, a Brizo Wall Mount Bar Faucet, and a brick-style façade for the bar area.
Challenges
The primary challenge, which we anticipated, was installing a sound system without replacing/updating the ceiling texture. We overcame this challenge by feeding the sound wiring from the basement’s mechanical space.
Another challenge was in the speaker and TV installation. We wanted a set-up that would be easy to access for the client in case of maintenance needs. To overcome this challenge, we built a faux wall with recessed space for the TV and speaker boxes which would be accessible from the mechanical room.
Challenges of the Remodel
One challenge, in particular, that’s worth noting: uneven subflooring. Uneven floors in kitchens can be especially hazardous for homeowners and can affect home value. The subflooring was fixed by pouring the floor leveler prior to installing the new LVT flooring.
Project Timeline
| Phase | Duration | Highlights |
|---|---|---|
| Consultation & Estimate | 3 days | On-site walkthrough and itemized quote delivered within 72 hours |
| Design & Planning | 1 week | Layout options reviewed; fixtures and finishes selected |
| Permits & Materials | 1.5 weeks | Permit approved and materials ordered to match timeline |
| Construction | 4 weeks | On-time execution with weekly check-ins and walkthroughs |
| Final Walkthrough | 2 days | Minor paint touch-ups and final client approval |
- Project completed on schedule and within 2% of original estimate.
Inspired by this project?
Let's talk about what's possible in your home.
Let's Bring Your Vision to Life.
Our team is ready to transform your home. Let's start with a free consultation — no pressure, no obligation.
Reviews: 135