Burnsville Basement Remodel – Bar & Entertainment

A warm, multi-purpose lower level designed for entertaining, relaxation, and long-term value.

Project Summary

Our client in Burnsville wanted their basement remodeled for optimal guest experiences. That included a new bar area as well as a built-in sound system throughout the space. Additionally, we replaced the flooring and added wall accents made of unique materials.

Home Remodeler Analysis

This was a great space for entertaining guests, and it provided us with the room necessary to deliver a full basement remodel. We also noted that the ceiling texture would present a challenge with the sound system.

The Client’s Goals

To remodel the space for an enhanced entertainment experience. They wanted a “throwback” look for the bar along with a new sound system.

Project Photos

Remodeler Approach

Custom Layout & Framing

Durable, Stylish Materials

Built-Ins & Finishing Touches

We used barn materials for much of this build, including barn wood (from a barn in Faribault, MN) and galvanized steel panels (from a barn in St. Cloud, MN). We also installed an artisan 3D multi-color barn wood accent wall. Other installations included NST Porcelain Plank Tile Flooring, a Brizo Wall Mount Bar Faucet, and a brick-style façade for the bar area.

Challenges

The primary challenge, which we anticipated, was installing a sound system without replacing/updating the ceiling texture. We overcame this challenge by feeding the sound wiring from the basement’s mechanical space.

Another challenge was in the speaker and TV installation. We wanted a set-up that would be easy to access for the client in case of maintenance needs. To overcome this challenge, we built a faux wall with recessed space for the TV and speaker boxes which would be accessible from the mechanical room.

Challenges of the Remodel

One challenge, in particular, that’s worth noting: uneven subflooring. Uneven floors in kitchens can be especially hazardous for homeowners and can affect home value. The subflooring was fixed by pouring the floor leveler prior to installing the new LVT flooring.

Project Timeline

Phase

Duration

Highlights

Phase

Consultation & Estimate

Duration

3 days

Highlights

On-site walkthrough and itemized quote delivered within 72 hours

Phase

Design & Planning

Duration

1 week

Highlights

Layout options reviewed; fixtures and finishes selected

Phase

Permits & Materials

Duration

1.5 weeks

Highlights

Permit approved and materials ordered to match timeline

Phase

Construction

Duration

4 weeks

Highlights

On-time execution with weekly check-ins and walkthroughs

Phase

Final Walkthrough

Duration

2 days

Highlights

Minor paint touch-ups and final client approval

Homeowner Feedback

Related Projects

Honey-Doers – 24 Years of Quality Remodeling

We provide home remodels and exterior services for a wide range of clients in the Twin Cities area. Whether your bathroom needs updating for comfortability or your bedroom could use a rework for storage space, we’ve got you covered. We also offer roof repair and replacement!